The Park 2.0 Gym Electrical Fit-Out

Our Approach

The unit started as a bare industrial space, requiring a full electrical infrastructure from the ground up. We began by installing a robust Uni-strut containment system with hangers, acting as brackets for both the cable trays and the halo LED lighting that would surround the gym’s entire perimeter.

This stage required careful coordination and precision to ensure the containment served multiple purposes while keeping the design clean and visually appealing.

Project Overview

WiredUp Ltd carried out a comprehensive electrical installation, which included:

  • Halo LED perimeter lighting – creating an immersive gym atmosphere
  • Socket circuits for gym equipment and general power supply
  • Emergency lighting for safety and compliance
  • Full fire alarm system installation and testing
  • Integrated speaker system throughout the facility
  • Motorised key switch for the roller shutter door
  • Changing room installations – power, lighting, and ventilation
  • Infrastructure planning for a future office space

All work was installed and tested to WiredUp Ltd’s professional standards, ensuring reliability, safety,
and long-term performance

Project Details

Client The Park 2.0 – Functional Fitness Gym
Duration 2 Weeks
Completion 7th July 2025
Result

Despite the tight deadline, our team completed the project on time thanks to exceptional teamwork, late nights, and meticulous project management.

What was once a bare industrial unit is now a vibrant, fully functional fitness hub that has helped create a thriving gym community and given new purpose to the space.